Anaheim, CA
The tile is fine. The roof might not be.
The most common tile job is not a replacement at all. It is a lift-and-relay: the same tile comes off, new underlayment goes down, the tile goes back.
Describe the tile and slate job
Three questions, then the address. Up to three Anaheim contractors who do this work.
Your request is in.
We are matching it now against roofing contractors working in Anaheim and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Before you let anybody on the roof
The things worth pinning down on a tile and slate job. A contractor who has not raised them has not looked properly.
- Fastener specification, especially near salt air
- Whether battens are being replaced at the same time
- The condition and age of the underlayment beneath
- What percentage of tile breakage they expect and how it is priced
- Whether the tile can be salvaged and relaid
Broken or slipped tiles are a maintenance item, not an emergency, provided the underlayment beneath is still sound.
Walking a tile roof breaks tile. That is not carelessness, it is physics, and any honest contractor will tell you a small percentage will be lost and replaced.
Ask specifically how many tile or slate roofs the crew completed last year. The honest number is often small.
Locally
Behind it: shaded slopes that never really dry out. Slopes that never get direct sun stay wet for hours after the fog burns off, and that is where moss, lifted shingles and soft decking start.
About tile and slate here
What does a new roof cost in Anaheim?
For a typical Anaheim home of about 25 squares, an architectural asphalt re-roof usually lands between $13,000 and $29,500. Tile, slate and standing-seam metal run well above that. The number moves on how many old layers come off, how much decking is soft underneath, and how easily a truck can get to the house.
Should I take the cheapest quote?
Only if it is the same roof. Most large gaps between quotes are scope gaps. Ask the cheapest contractor which of the other quotes items they have left out, and why.
How long does a re-roof take?
A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.
I have solar panels. What happens to them?
They come off and go back on, and that is a separate cost, often handled by the solar installer rather than the roofer. If the roof is near the end of its life, do the roof first — removing and refitting panels twice is money wasted.
