Anaheim Roof WorksLocal roofers. Straight answers. Free estimates.My estimate

Guide

The maintenance that actually matters

You cannot maintain your way out of old age, but you can comfortably add five years to a roof that is otherwise sound.

Guide7 sections1 min readAnaheim, CA

Get it looked at

Three questions, and up to three Anaheim contractors. Free either way.

Free · Takes about a minute

Get it looked at

Three questions, and up to three Anaheim contractors. Free either way.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

No cost to you. Contractors pay us, you do not.

Deal with growth properly

Moss and algae hold water against the surface. Treat and brush gently, or fit zinc or copper strip near the ridge. Never pressure wash an asphalt roof — it strips the granules and takes years off it in an afternoon.

Keep the penetrations honest

Pipe boots crack, sealant shrinks, and satellite mounts get screwed straight through the covering. Every penetration is a hole somebody decided to make watertight, and each is worth a look.

Twice a year, from the ground

Walk the perimeter with binoculars if you have them. You are looking for missing or lifted material, dark patches, sagging lines, and anything growing where it should not be. Ten minutes, twice a year.

Clear the gutters before the wet season

Gutters full of grit are not just a drainage problem — the grit is your roof, and its presence tells you something about how far along the covering is.

Cut back anything touching the roof

Branches abrade the surface in wind and drop debris that holds moisture. Keep growth well clear of the covering, and clear of the gutters while you are at it.

Look in the attic after heavy weather

The attic shows a leak long before the ceiling does. After any serious storm, take a torch up and look at the underside of the deck around penetrations and valleys.

In short

Put two dates in the calendar, one either side of November through March. That is the whole programme.

Related questions

What time of year is best to re-roof in Anaheim?

Here, the long dry run from May to October is the easy window. November through March is when the phone rings hardest, which means less flexibility on dates and less room on price.

Can I just put a new roof over the old one?

Codes in most places allow two layers. That does not make it wise. You lose the chance to see the deck, and the next roofer has twice as much to remove.

Is this really free?

It is free to you. Contractors pay to receive homeowner requests in their area. That is the entire business model, and we would rather say so plainly than pretend otherwise.

Start with a free estimate

It is free, and nothing obliges you to hire anyone.